Shortly after leaving Island Park and crossing over the Long Beach Road grade crossing the two Long Beach Branch merge into one and the line goes over the LEAD drawbridge.
Today's post will focus more on LEAD interlocking, the tracks themselves. A post which will appear tomorrow morning will have a lot more information on the LEAD drawbridge which spans the Reynolds Channel.
The interlocking itself begins a couple hundred yards after the Long Beach Road crossing, immediately to the west of Island Park station. Right after the interlocking begins Long Beach Branch track 2 merges into Long Beach 1. As soon as the two tracks merge together the speed limit drops down to 30 m.p.h. (though southbound trains will get further restricted later on).
| View of the LEAD drawbridge going south into Long Beach station. |
Northbound trains can cross the drawbridge at speeds of up to 30 m.p.h. if all goes well.
LEAD interlocking officially ends just after the drawbridge ends. Only a small handful of switches into the Long Beach station and yard are part of LEAD interlocking. Everything else at Long Beach is hand-thrown.
Long Beach still retains a number of position light signals, including a number of dwarf signals (as pictured in the photo above).
LEAD interlocking is also home to one of the LIRR's few remaining active towers, LEAD tower. If you look in the photo above you can see LEAD tower, it's the dark brick structure on the drawbridge itself, to the right of the steel lift structure.
LEAD essentially needs a tower here because of the movable bridge at this location. It could be possible to remote the interlocking and control of the bridge to Jamaica, but the best rule of thumb when it comes to moveable bridges is to have an actual human on site making sure everything is going well (a computer screen might say the bridge is down, but if something malfunctioned, it could not be a pretty ending.
That essentially completes today's tour of LEAD interlocking. Be on the lookout for tomorrow's post which will detail more thoroughly the operations of LEAD drawbridge itself. Furthermore, Friday's post will take a look at the three other moveable bridges on LIRR territory.
Growing up nearby to LB, I always wondered why there were 2 third rails(You can see it in the photo) on the bridge.
ReplyDeleteLots of times the LIRR will use a third rail as a means for transmitting power from place to place without the use of cables. Instead of going through the trouble of laying underwater cables to bridge the gap between Island Park and Long Beach, the LIRR runs another third rail across the bridge.
DeleteThink of it as a giant thick transmission cable that runs over the bridge, it's sturdier and less likely to corrode than a transmission cable.
There is another example of this on the mainline by Forest Hills, at one point there is a second third rail that runs along the Mainlie, but this one is back a couple inches so the train's third rail shoes can't get at it.
The extra third rail doesn't provide power to trains, but it does serve as a good power conductor to get power from one place to another.
~ Patrick @ The LIRR Today